Projexasia were appointed as the Main Contractor for the fast track fitting out works at L76, The Centre, Central, Hong Kong. The works included hi-end fitting out works for a full floor (17,000 sq. ft) office space including E&M modification and installation, glazed partition, sound insulated gypsum partition with sound baffles, various ceiling, wall and floor finishes, built-in furniture, system furniture and signages, etc